Contact
Tel: 18037961302
Sales hot line ( 24 hours  service): 18037961302

E-Mail: firstfurnace@gmail.com

whatsapp:+8618037961302

Adress: Luoxin Industrial Park, Luoyang, Henan
  • Products
  • Gear hardening machine

    Large diameter steel pipe quen

    Piston rod quenching and tempe

    Hand-held induction heater

    Grinding rod quenching and tem

    Induction forging machine

    induction heating machine 

    Induction heater

    High frequency induction heate

    Super audio induction heating

    Super audio induction heating

    Guideway quenching integrated

    Quenching equipment for machin

    Round steel end heating furnac

    Steel pipe heat treatment prod

    Square steel quenching and tem

    Sucker rod quenching and tempe

    Thickened petroleum steel pipe

    Round steel quenching and temp

    Steel pipe quenching and tempe

    Steel plate quenching and temp

    Induction Hardening Machine&nb

    Flywheel ring gear high freque

    Oil drill pipe quenching and t

    Iron induction furnace

    Aluminum melting furnace

    Copper melting furnace

    Small steel melting furnace

    Electric furnace principle(原理)
        

    Reasons for the leakage of induction melting furnace

     

    A common accident in the furnace body of an induction melting furnace is leaking through the furnace. If there is an accident, if no measures are taken, it will cause the copper tube of the coil to rupture, and the molten iron and the coolant will explode. s reason:

    1. Quality factors of materials used in furnace construction: generally use quartz acid furnace lining materials. The silicon content of quartz sand and quartz powder should be above 99.5%, with oily crystals, transparent and free of impurities. Generally use high-purity quartz sand (silicon content 99.85%, hardness 8, density 2.65, refractoriness 1850 degrees).

    2. Binder factors used in furnace construction: traditional furnace construction methods generally use boric acid as a binder. Boric acid has both advantages and disadvantages: the advantage is that the bonding is fast at low temperature, generally starting at 600-700 degrees; the disadvantage is that it is not resistant to high temperature and erosion. Under high temperature conditions, the lower part of the furnace wall will cause the phenomenon of boiling , The number of heats used is greatly reduced. It is recommended to use boric acid as a binder, because boric acid has the characteristics of high temperature bonding, high melting point, high temperature resistance, and erosion resistance.


    Copyright© 2007-2013 songdao Electric furnace manufacturing Co,.Ltd All Rights Reserved
    Tel:18037961302 Sales hot line ( 24 hours service): 18037961302
    E-Mail:firstfurnace@gmail.com
    Adress: Luoxin Industrial Park, Luoyang, Henan