Contact
Tel: 18037961302
Sales hot line ( 24 hours  service): 18037961302

E-Mail: firstfurnace@gmail.com

whatsapp:+8618037961302

Adress: Luoxin Industrial Park, Luoyang, Henan
  • Products
  • 1T Intermediate Frequency Furn

    0.25T Intermediate Frequency F

    0.5T Intermediate Frequency Fu

    Medium Frequency Furnace

    One Belt Two Intermediate Freq

    series intermediate frequency

    Steel Shell Intermediate Frequ

    3T Parallel Intermediate Frequ

    Aluminum Shell Medium Frequenc

    Steel pipe medium frequency qu

    Round steel medium frequency f

    Surface quenching and single t

    Drill pipe medium frequency co

    Medium frequency forging furna

    25 80 round steel induction

    70100 round steel induction

    KGPS300KW/1.5 round steel medi

    50 100 round steel heating f

    Metal casting furnace

    Copper casting furnace

    Gold melting furnace

    Silver melting furnace

    50kg metal powder atomization

    50KG medium frequency copper m

    800 KG electromagnetic copper

    Medium frequency copper meltin

    Scrap copper melting furnace

    300kg copper melting furnace

    Electric furnace repair
        

    Two aluminum alloy half-turns are assembled into two aluminum half furnace shells to insulate each other

     

    1. Causes of aluminum Aluminum light Aluminum conductivity is good When the furnace ring is connected to high frequency electricity, magnetic flux is generated to generate eddy current in the middle of the aluminum shell.

     

    The magnetic flux is out-diffused. The magnetic flux is compressed to the vicinity of the furnace body. The near-magnetic flux density of the furnace ring is high. The melting of molten iron is also fast.

     

    Interfering with people and home appliances

     

    2. The reason for the two halves If the aluminum shell is a whole, it seems that a coil with a small resistance crosses the outside of the furnace ring.

     

    Direct short circuit of the secondary turns of the press, making the no-load current large, high power consumption, low efficiency of the whole furnace

     

    3. Separate open method Separated by asbestos board Tightened with copper bolts and insulated with copper shackles and aluminum shells

     

    4. The two ground support seats are preferably connected with no conductive material between the cements. If the steel bars are used, it is equal to the short circuit of the two aluminum half furnace shells.

     


    Copyright© 2007-2013 songdao Electric furnace manufacturing Co,.Ltd All Rights Reserved
    Tel:18037961302 Sales hot line ( 24 hours service): 18037961302
    E-Mail:firstfurnace@gmail.com
    Adress: Luoxin Industrial Park, Luoyang, Henan