Contact
Tel: 18037961302
Sales hot line ( 24 hours  service): 18037961302

E-Mail: firstfurnace@gmail.com

whatsapp:+8618037961302

Adress: Luoxin Industrial Park, Luoyang, Henan
  • Products
  • Gear hardening machine

    Large diameter steel pipe quen

    Piston rod quenching and tempe

    Hand-held induction heater

    Grinding rod quenching and tem

    Induction forging machine

    induction heating machine 

    Induction heater

    High frequency induction heate

    Super audio induction heating

    Super audio induction heating

    Guideway quenching integrated

    Quenching equipment for machin

    Round steel end heating furnac

    Steel pipe heat treatment prod

    Square steel quenching and tem

    Sucker rod quenching and tempe

    Thickened petroleum steel pipe

    Round steel quenching and temp

    Steel pipe quenching and tempe

    Steel plate quenching and temp

    Induction Hardening Machine&nb

    Flywheel ring gear high freque

    Oil drill pipe quenching and t

    Iron induction furnace

    Aluminum melting furnace

    Copper melting furnace

    Small steel melting furnace

    Electric furnace repair£¨Î¬ÐÞ£©
        

    Induction melting furnace furnace lining maintenance content

    The routine maintenance and overhaul of induction melting furnaces is very important. It can detect all kinds of hidden dangers in time, avoid major accidents and ensure long-term safe production, and promote the improvement of casting output and quality.

    The maintenance and repair contents of the furnace lining, induction coil, flexible wire, furnace cover, hydraulic system, cooling system and electrical system of induction furnace are listed in the following table. The methods provided in the table are mainly based on the working characteristics of the induction furnace, and many of the contents are also applicable to the grooved induction furnace.


    Maintenance and repair project

    Maintenance and repair content

    Inspection time and frequency

    Remarks

    furnace

     

     

    lining

     

     

    Does the lining have cracks?

    See if there is any crack

    Cold furnace before each furnace

    If the crack width is less than 22 mm , if the chips or the like are not embedded in the crack, they do not need to be repaired and can still be used.Otherwise it needs to be patched before it can be used.

    Repair of the taphole

    Observe whether there is crack at the junction of the side refurbishment lining and the taphole

    When tapping

    If there is a crack, repair it

    Repair of furnace bottom and slag line lining

    Observe whether the lining of the bottom of the furnace and the slag line is partially corroded.

    After tapping

    If there is obvious erosion, it needs to be repaired.

    sense

     

    should

     

    line

     

    ring

     

     

    Visual inspection

    ( 1 )            Is the coil insulation part bumped and carbonized?

    ( 2 ) Whether there is adhesion to the surface of the coil

    ( 3 ) Does the insulation pad between the coils protrude?

    ( 4 ) Is the mounting bolt of the top tight coil loose?

    1 time / day

    1 time / day

    1 time / day

    1 time / 3months

    Purge with compressed air in the workshop

     

     

    Tighten the bolt

    Coil compression screw

    Visually check if the coil compression screw is slack

    1 time /week

     

    rubber tube

    ( 1 )            Is there any leakage at the rubber pipe joint?

    ( 2 )            Check if the rubber tube is cut

    1 time / day

    1 time /week

     

     

    Coil corrosion joint

    Remove the rubber hose and check the corrosion resistance of the corrosion joint at the end of the coil

    1 time / 6months

    When the corrosion joint is corroded by 1/2or more, it needs to be replaced with a new one.Usually changed every two years

    Cooling water temperature at the coil outlet

    Under the rated amount of molten iron and rated power, record the maximum and minimum cooling water temperature of each branch of the coil

    1 time / day

     

    Dust removal

    There is compressed air in the workshop to blow off the dust and molten iron on the surface of the coil.

    1 time / day

     

    Pickling

    Pickling of the sensor water pipe

    1 time / 2years

     

    can

    scratch

    Sex

    guide

    line

     

     

    Water cooled cable

    ( 1 ) Whether there is leakage

    ( 2 ) Check if the cable is in contact with the pit

    ( 3 ) Record the cable outlet temperature at rated power

    ( 4 ) Preventive measures taken to prevent accidents

    ( 5 ) Check if the connection bolts at the terminal end are discolored

    1 time / day

    1 time / day

    1 time / day

    1 time / 3years

    1 time / day

    According to the number of tilting, the life of the water-cooled cable is determined to be three years. It needs to be replaced after three years. If the bolt is discolored, re-tighten.

    Maintenance and repair project

    Maintenance and repair content

    Inspection time and frequency

    Remarks

    furnace

     

     

     

     

    cover

     

     

    Dry cable

    ( 1 ) Eliminate dust on the busbar splint of insulating rubber

    ( 2 ) Check if the chain of the suspension busbar is broken

    ( 3 ) Is the busbar copper foil disconnected?

    1 time / day

     

    1 time /week

    1 time /week

    When the copper foil area is 10% of the busconductive area , a new busbar needs to be replaced.

    Refractory pouring material

    Visual inspection of the refractory lining inspection lid watering a layer thickness

    1 time / day

    When the thickness of the refractory potting material is 1/2, the lining of the furnace cover should be rebuilt.

     

    Hydraulic furnace cover

     

    ( 1 ) Whether there is leakage at the sealing part

    ( 2 ) Leakage of piping

    ( 3 ) Leakage of high pressure pipe

    1 time / day

    1 time / day

    1 time / day

    If so, repair it

    Exchange

    High pressure pipe

    ( 1 ) There are traces of iron scald on the high-pressure pipe, etc.

    ( 2 ) To ensure safety, exchange

    1 time /week

    1 time / 2years

     

     

    Lubricating

    ( 1 ) Manual type: part of the fulcrum of the furnace cover

    ( 2 ) Electric type: sprocket drive bearing for shaft adjustment chain for shaft cover wheel

    ( 3 ) Hydraulic type: guide bearing

     

     

    pour

     

    move

     

    oil

     

    Cylinder

    Cylinder lower bearing and high pressure pipe

    ( 1 ) There are traces of iron scald on the bearing part and the high pressure pipe

    ( 2 ) oil leakage

    1 time /week

     

    1 time /month

     

     

    Remove the cover for inspection

     

    Cylinder

    ( 1 ) Whether there is leakage at the sealing part

    ( 2 ) abnormal sound

    1 time / day

    1 time / day

    Observe the cylinder block when tilting the furnace

    When a sound such as a knocking cylinder is issued, most of the bearings are short of oil.

     

    Inclined limit switch

    ( 1 )            Action check

    Press the limit switch by hand and the pump motor should stop running.

    ( 2 ) Whether there is splashing molten iron on the limit switch

    1 time /week

     

    1 time /week

     

    Lubricating

    All the fuel filler ports

    1 time /week

     

    High pressure control

    cabinet

     

    Cabinet inspection

    ( 1 ) Check the operation of each indicator bulb

    ( 2 ) Whether the parts are damaged or burned out

    ( 3 ) Clean the inside of the tray with compressed air in the workshop

    1 time /month

    1 time /week

    1 time /week

     

     

    Circuit breaker vacuum switch

    ( 1 ) Cleaning pass is the contact

    The vacuum tube is milky white, blurred, and the vacuum is reduced.

    ( 2 ) Measuring electrode consumption

    1 time / 6months

     

     

    1 time /month

     

     

    If the gap exceeds 6 mm,replace the vacuum tube

    Main switch cabinet

     

     

     

     

    Electromagnetic air switch

    ( 1 ) The roughness of the main contact, the amount of wear

    ( 2 )            Come on

    ( 3 ) Whether the fire extinguishing board has carbonization

    1 time / 6months

     

     

     

    1 time / 6months

     

    1 time / 6months

    Grinding with a trowel, sand, etc.

    When the contact wear exceeds 2/3 , change the contact

    Adding spindle oil to each bearing and link

    The carbonized part is ground with sand

     

    Maintenance and repair project

    Maintenance and repair content

    Inspection time and frequency

    Remarks

    Main switch cabinet

     

    ( 4 ) Dust removal

    1 time /week

    Clean with compressed air in the workshop and wipe off the dust on the insulator with a cloth

    Insulation resistance

    Use a 1000 volt megger to measure the main loop with greater than 10M ¦¸between

     

     

    Converter switch

     

    Transfer switch

    ( 1 ) Measuring insulation resistance

    ( 2 ) switch main joint rough

    ( 3 ) The main circuit connecting bolt is loose and overheated

    1 time / 6months

    1 time /month

    1 time / 3months

    Measuredbetween the conductor and the ground with a 1000volt megger

    1M ¦¸

    Polish or exchange

    control

     

    system

     

    cabinet

     

    station

    Cabinet inspection

    ( 1 ) Whether the component is damaged or burned out

    ( 2 ) Whether the component is slack or falling off

    1 time /week

    1 time /week

     

     

    Action test

    ( 1 ) Check if the indicator light is on

    ( 2 ) Alarm circuit

    Should check the action according to the alarm condition

    1 time /week

    1 time /week

     

    Dust removal inside the cabinet

    Use workshop compressed air to clean

    1 time /week

     

     

    Auxiliary machine contactor

    ( 1 ) Check the roughness of the joint, and use a fine sand to smooth it when it is rough.

    ( 2 ) Exchange contacts

    Replace when the contact is worn out

    1 March

     

    1 time / 2years

    In particular, the contactor for the furnace cover that is often used

    Transformer reactor

    Check appearance

    ( 1 ) Is there any oil leakage?

    ( 2 ) Whether the insulating oil is added to the specified position

    1 time /week

    1 time /week

     

    Transformer and reactor temperature

    Check the daily thermometer indication, below the specified value

    1 time /week

     

    Sound and vibration

    ( 1 ) usually check by listening and touching

    ( 2 ) Instrument measurement

    1 time /week

    1 time /year

     

    Insulating oil pressure test

    Should meet the specified value

    1 time / 6months

     

    Tap changer

    ( 1 ) Check the tap conversion for offset

    ( 2 ) Check the roughness of the tap adapter

    1 time / 6months

    1 time / 6months

    Change the new one when it is severely rough with fine sand

    Capacitor bank

    Check appearance

    ( 1 ) Is there any oil leakage?

    ( 2 ) Whether the terminal screws are loose or not

    1 time / day

    1 time /week

    If slack occurs , theterminal part will change color due to overheating.

    Replacing the contactor of the capacitor

     

     

    Dust removal

    ( 1 )            Rough joint

    1 ) Smooth the rough part with a trowel sand

    2 ) When the wear is severe, change the joint

    ( 2 ) Contact temperature rise

    Wipe the insulator with a cloth using a compressed air in the workshop

    1 time / 6months

     

     

    1 time /week

    1 time /week

     

     

    At least 1 time/ month

    Temperature around the capacitor bank

    Mercury thermometer measurement

    1 time / day

    Ventilated, so that the surrounding temperature does not exceed 40 ¡æ

    Oil pressure device

     

     

    Hydraulic oil

    ( 1 ) Whether the oil level of the oil level indicates the color of the oil changes

    ( 2 ) Check the amount of dust in the hydraulic oil and the quality of the oil

    ( 3 ) Measuring temperature

    1 time /week

     

    1 time / 6months

     

    1 time / 6months

    If the oil level drops ,the circuit leaks

    When the quality is poor , change the oil.

    pressure gauge

    Whether the pressure of the tilting furnace is different from normal, when the pressure drops, adjust the pressure to normal value.

    1 time /week

     


    Maintenance and repair project

    Maintenance and repair content

    Inspection time and frequency

    Remarks

    oil

     

    Pressure

     

    Loading

     

    Set

     

     

    Pump

    Check if the noise of the pump is abnormal

    1 time /week

    When the pump is noisy , there are the following reasons :

    (1) Inhaling air from a suction filter

    (2) Inhaling air on the suction side of the pump

     

     

    Pressure regulating valve

    (1) When the time lag occurs from the start of the pump to the pressure rise and the noise of the pressure regulating valve becomes louder ,disassemble the pressure regulating valve for cleaning.

    (2) When the speed of the tilting furnace is too slow , increase the setting of the pressure regulating valve within the maximum operating pressure range of the device . The set pressure does not rise , and the cleaning is performed for cleaning.

     

     

     

     

    Pipeline filter

    Disassemble the filter for cleaning

    Exchange parts

    The first time a month laterfor the 1/3months

    1 time / 2years

     

    Piping

    Emergency generator

    Petrol Engine

    Hand pump

    Visually check for oil leaks on the piping

    Prevent rust , start engine pump

    Check by attached inspection book

    Take measures to prevent rust and start the hand pump

    1 time /month

    1 time /month

     

    1 time /month

     

    Blower

     

    Fan belt

    Whether the belt is slack

    Whether the belt is disconnected

    The first time is one month , and thefuture is

    1 time / 6months

     

    Gas filter

    Visually check the vacuum status and clean it with compressed air in the workshop

    1 time /month

     

     

    Noise, vibration

    The noise and vibration of the blower are different from usual.

    1 time /week

     

    Lubricating

    Blower bearing

    1 time / 3months

     

    Cooling water circuit

     

     

     

     

    Cooling water pump

    (1) Bearing temperature and motor case temperature

    (2) When the pump bearing has water leakage , thereinforced bearing

    (3) The noise and vibration of the motor and pump are different from usual.

    (4) after long-term operation, or in the winter, night stops running, should be excluded from surplus water

    (5) gland seal electrical wear

    1 time /week

    1 time /month

    1 time /month

     

     

     

    1 time / 1.5to 2 years

     

     

     

     

     

    Cooling Tower

    (1) Blockage of the nozzle

    (2) Filtration of the filter :

    Clean or exchange when there is serious pollution

    (3) Whether the fan belt is slack

    (4) Fan bearing lubrication

     

     

     

    Initialinspectionis a once a month,after 1/3months

    1 time / 3months

    Check the nozzle for blockage from the inspection window during operation

    Maintenance and repair project

    Maintenance and repair content

    Inspection time and frequency

    Remarks

     

     

     

     

     

    Cooling water circuit

     

     

     

     

     

     

     

     

     

    Cooling water circuit

    (1) Is the flowmeter flow different from usual?

    (2) Cleaning filter

    (3) Water pressure gauge

    Whether the alarm value is normal or not, the pressure indication is different from usual.

    (4) Thermometer

    The thermometer indicates whether it is normal

    Whether the alarm contact point is abnormal

    (5) Piping

    Whether the piping has leaked

    1 time / day

    1 time / 3months

    1 time /week

     

     

     

    1 time /month

    1 time /week

     

    1 time / day

     

     

    Emergency equipment

    (1) Gasoline engine pump

    Run weekly, half-hour time

    (2) Gasoline engine inspection according to subsidiary inspection

    (3) Emergency solenoid valve

    1 time /week

     

     

    1 time / day

     

    Leakage alarm device

    Electrode lead line inspection

    (1) Is the electrode lead wire connected normally?

    (2) Whether the electrode lead wire is grounded

    1 time / day

    Check with a test stick

     

    Coil check

    When removing the furnace :

    Whether the coil is burnt out due to molten metal

    Whether there is bump in the coil

    Is there any other damage to the coil?

     

    It is more appropriate tofill the coil insulation with asbestos plaster for 3 to5 years.




    Copyright© 2007-2013 songdao Electric furnace manufacturing Co,.Ltd All Rights Reserved
    Tel:18037961302 Sales hot line ( 24 hours service): 18037961302
    E-Mail:firstfurnace@gmail.com
    Adress: Luoxin Industrial Park, Luoyang, Henan