Contact
Tel: 18037961302
Sales hot line ( 24 hours  service): 18037961302

E-Mail: firstfurnace@gmail.com

whatsapp:+8618037961302

Adress: Luoxin Industrial Park, Luoyang, Henan
  • Products
  • Gear hardening machine

    Large diameter steel pipe quen

    Piston rod quenching and tempe

    Hand-held induction heater

    Grinding rod quenching and tem

    Induction forging machine

    induction heating machine 

    Induction heater

    High frequency induction heate

    Super audio induction heating

    Super audio induction heating

    Guideway quenching integrated

    Quenching equipment for machin

    Round steel end heating furnac

    Steel pipe heat treatment prod

    Square steel quenching and tem

    Sucker rod quenching and tempe

    Thickened petroleum steel pipe

    Round steel quenching and temp

    Steel pipe quenching and tempe

    Steel plate quenching and temp

    Induction Hardening Machine&nb

    Flywheel ring gear high freque

    Oil drill pipe quenching and t

    Iron induction furnace

    Aluminum melting furnace

    Copper melting furnace

    Small steel melting furnace

    Electric furnace repair£¨Î¬ÐÞ£©
        

    Inspection of induction melting furnace failure

    There are many types of induction melting furnace faults, so specific faults should be analyzed. The various parts of the induction melting furnace interact and interact with each other. Therefore, after the fault or troubleshooting, the intermediate frequency furnace should be inspected systematically. Ensure that the intermediate frequency furnace is in good condition.

    (1) Measure the cold resistance of the rectified and inverter thyristors with an ohmmeter. Under the condition of water passing, measure with 200Q, the forward and reverse resistances should be infinite:

    (2) Observe whether the indication of the control instrument in the cabinet is normal;

    (3) Observe whether the rectification and inverter trigger pulses are normal with an oscilloscope;

    (4) If the main circuit is not open, start the control and inverter start button, observe whether the control instrument indication is normal, and observe whether the rectifier and inverter thyristor trigger pulses are normal with an oscilloscope;

    (5) Start the analog overcurrent and overvoltage protection circuit and observe whether the rectification trigger pulse and phase shift are normal.

    (6) When the fault is removed, use the oscilloscope to observe whether the waveform of the inverter thyristor and the rectified output waveform are normal.

     

     

     


    Copyright© 2007-2013 songdao Electric furnace manufacturing Co,.Ltd All Rights Reserved
    Tel:18037961302 Sales hot line ( 24 hours service): 18037961302
    E-Mail:firstfurnace@gmail.com
    Adress: Luoxin Industrial Park, Luoyang, Henan