Contact
Tel: 18037961302
Sales hot line ( 24 hours  service): 18037961302

E-Mail: firstfurnace@gmail.com

whatsapp:+8618037961302

Adress: Luoxin Industrial Park, Luoyang, Henan
  • Products
  • Special intermediate frequency

    1 ton induction melting furnac

    5T steel shell induction melti

    10 tons induction melting furn

    Intelligent control 5 tons ind

    2 ton series induction melting

    0.75t series induction melting

    0.5 ton induction melting furn

    Energy saving 0.5 ton series i

    Small induction melting furnac

    Mini Induction melting furnace

    0.5T intermediate frequency me

    5T induction melting furnace 2

    3T induction melting furn

    500kg induction melting furnac

    250kg induction melting furnac

    1T induction melting furnace 2

    2T induction melting furnace 2

    Induction melting furnace 2022

    0.25T Intermediate Frequency F

    0.5T Intermediate Frequency Fu

    Medium Frequency Furnace

    2T Induction Melting Furnace

    1T Induction Melting Furnace

    500kg Induction Melting Furnac

    250kg Induction Melting Furnac

    Induction Melting Furnace

    3 T Induction Melting Furnace

    Electric furnace repair
        

    Process for quickly repairing copper tube burn-through of intermediate frequency furnace inductor

     When the induction coil is severely ignited, a arc will be formed, and a severe arc will cause the copper tube to be broken at the arcing portion. In another case, after the lining is burned through, the iron overflow causes the copper platoon to burn through.   After the copper platoon is burned, the cooling water overflows and must be immediately repaired. Since the copper bars are installed in the furnace shell, the welding repair is inconvenient and needs to be removed and removed during the repair. Usually, the copper platoon repair process wastes at least one lining, which is more time consuming. Here is a sticky method for everyone to save maintenance costs.  

     For the first reason caused by the copper row burn-through, the furnace can be temporarily shut down, and the copper piece of 1 ~ 2mm thick is cut into small pieces, the area should be slightly larger than the area of the copper discharge crack, and then removed by a saw blade or a hand grinding wheel. The residue of the copper platoon is burned and cleaned with sandpaper. The FCR copper crack fast repairing agent is quickly mixed with the curing agent, and the trimmed copper sheet is stuck in the copper row cracking. After a few minutes, the FCR is solidified. The high copper bond strength can be re-opened at this time.

     

      For the second reason caused by the copper row burn-through, the repair process is as follows: tilting the furnace iron ★ stopping the furnace ★ repairing the furnace lining ★ copper row bonding + opening furnace. This repair process also saves a lining and a large amount of man-hours and oven power compared to conventional weld repairs.


    Copyright© 2007-2013 songdao Electric furnace manufacturing Co,.Ltd All Rights Reserved
    Tel:18037961302 Sales hot line ( 24 hours service): 18037961302
    E-Mail:firstfurnace@gmail.com
    Adress: Luoxin Industrial Park, Luoyang, Henan