E-Mail: firstfurnace@gmail.com
whatsapp:+8618037961302
Adress: Luoxin Industrial Park, Luoyang, HenanLarge AC Motors Terminal Rings
Medium-frequency welding of mo
Medium-Frequency Brazing Equip
Integral Brazing Process for t
Online Heating Equipment for T
Online Heating Equipment for A
Aluminum ingot heating equipme
Welding Equipment for Traction
Fully Digital Medium Frequency
Motor rotor end ring brazing e
Brazing equipment for hydro ge
Generator rod induction brazin
Hydropower generator stator ba
Large diameter steel pipe quen
Piston rod quenching and tempe
Grinding rod quenching and tem
induction heating machine 
Melting furnace inspection steps before leaving the factory
1. In order to verify the quality of the contract equipment and related equipment during the production period, the tenderee has the right to send the person to the factory where the winning bidder is located for inspection. For the transportation expenses at the location of the winning bidder and for the quality inspection requirements of the bidder, such as necessary safety equipment, office supplies, technical documents and drawings, accounting data, manufacturing and inspection standards and other necessary inspection data shall be free of charge by the winning bidder. provide.
2. The written materials formed by all the supervisors and quality inspection activities of the tenderer during the manufacturing period shall not be used as the quality certification documents of the successful bidder. Before the delivery, the quality inspection of the tenderer shall not remove the responsibility of the contract within the scope of the supplier's quality guarantee period, nor shall it replace the quality inspection of the equipment at the tenderee's site.
3 . In the mid-inspection, the issues discovered or raised by members of the quality inspection team shall be resolved through friendly consultations.
4. The equipment must be tested in the overall joint test before leaving the factory. The time for the inspection of the tenderee shall be determined according to the trial operation time. The joint trial operation shall be carried out under the supervision of the inspector of the tenderee.
5. If there is a problem in the assembly test after the equipment arrives at the bidder's site, the reason is that the winning bidder did not perform the overall joint commissioning of the equipment before leaving the factory, so the delay time will be calculated according to the delayed delivery date.