Contact
Tel: 18037961302
Sales hot line ( 24 hours  service): 18037961302

E-Mail: firstfurnace@gmail.com

whatsapp:+8618037961302

Adress: Luoxin Industrial Park, Luoyang, Henan
  • Products
  • Gear hardening machine

    Large diameter steel pipe quen

    Piston rod quenching and tempe

    Hand-held induction heater

    Grinding rod quenching and tem

    Induction forging machine

    induction heating machine 

    Induction heater

    High frequency induction heate

    Super audio induction heating

    Super audio induction heating

    Guideway quenching integrated

    Quenching equipment for machin

    Round steel end heating furnac

    Steel pipe heat treatment prod

    Square steel quenching and tem

    Sucker rod quenching and tempe

    Thickened petroleum steel pipe

    Round steel quenching and temp

    Steel pipe quenching and tempe

    Steel plate quenching and temp

    Induction Hardening Machine&nb

    Flywheel ring gear high freque

    Oil drill pipe quenching and t

    Iron induction furnace

    Aluminum melting furnace

    Copper melting furnace

    Small steel melting furnace

    A single layer of epoxy powder coating งถ108 -งถ1016 pipe coating line

    product description

        


    A single layer of epoxy powder coating งถ108 -งถ1016 pipe coating line

    1, the project content:

    งถ108 -งถ1016 steel single layer of epoxy powder coating Coating Production Line

    2, the design basis:

    Steel pipe diameter: งถ 108 กชงถ1016

            Steel pipe length: 8000mm-12000mm

    Process speed: 1200mm/min - 5000mm/min

    3, the pipeline conveyor

    According to user requirements, our single layer of epoxy powder coating งถ108 -งถ1016 pipe coating line is designed as a transmission line in a single round of the power unit, so that the speed of the pipeline operation more smoothly and easily adjust the size of the pitch tube. The reducer adopts WPA type, and the power is 7.5 KW inverter motor, a total of 6 sets. The power control adopts centralized control, the control cabinet is a piano cabinet, and the frequency converter is concentrated in four control cabinets. The frequency converter adopts domestic famous brands. The base of the conveyor is welded with GB 20# channel steel, 20# rectangular steel and 14mm thick steel plate. The specification of this production line conveyor is 2000mm กม 6000mm กม 13 (four sets of tires per rack). 2000mm กม 800mm กม 10, (including eight sets of tires, one assembled high-temperature wheel, and two single-frame each set of two sets of tires). The transfer wheel is a 600-9 pneumatic tire (stronger than the solid wheel, the pipe runs smoothly). The base of the transmission wheel is fixed on the adjusting rail with the same hole spacing by 4 screws to facilitate the adjustment of the size of the pipe. The angle adjustment adopts the screw adjustment, which improves the pipeline transmission accuracy and reduces the labor intensity. The total length is 90 meters.

    4, the descaling machine:

    This machine is based on the introduction of advanced technology from the United States and Italy, using a modern computer simulation technology, developed a new type of steel pipe outer wall shot blasting equipment, which can remove the rust and scale on the surface of the steel pipe, completely before the outer wall of the steel pipe is painted. The cleaning requirements can meet the needs of cleaning the outer wall of large and medium-sized engineering steel pipes. It has the following advantages:

    1. The fifth-generation cantilever centrifugal blasting machine with large shot blasting and high throwing speed has significantly improved the cleaning efficiency and obtained satisfactory cleaning quality. It is a patented product.

    2. The equipment has been successfully developed according to the redesign of advanced technology at home and abroad. It has the characteristics of high productivity, convenient operation and small volume, and is the first in China.

    5, medium frequency heating:

    This production line is equipped with two intermediate frequency heating devices of 500KW and 1000KW. Before using 500KW for descaling machine, remove the surface moisture of the steel pipe, improve the descaling effect, and prevent the steel pellets from agglomerating. 1500KW is used for external epoxy powder coating heating.

    5 00kw parameters:

    Name

    Parameter

    Name

    Parameter

    Input voltage

    380V

    Output maximum voltage

    780V

    Input Current

    82 0A

    Output maximum current

    1 000A

    Input frequency

    50HZ

    Output frequency

    500HZกซ800HZ

    10 00kw parameters:

    Name

    Parameter

    Name

    Parameter

    Input voltage

    380V

    Output maximum voltage

    780V

    Input Current

    1700A

    Output maximum current

    2000A

    Input frequency

    50HZ

    Output frequency

    500HZกซ800HZ

     

    6, dusting system:

    1, 8 gun control center. DK type 2 sets

    Each set of the above devices contains 8 automatic spray guns, the spray gun is built-in high pressure, and the control cabinet controls the voltage, current and pneumatic system of 8 automatic spray guns. And control 8 venturi powder pump powder supply system.

    Each set of the above devices contains a fluidized bed powder supply system. The fluidized bed has the following dimensions: (LกมWกมH) 800กม775กม570 (mm) containing 8 venturi powder pumps.

    7, water cooling room:

    The water cooling room is closed by plastic steel glazing, which is beautiful and easy to observe. There are several activity windows on each side for easy access. The cooling water pump uses a flow rate of three cubic meters per hour (one standby). In addition, two intermediate frequency cooling water pumps have a flow rate of 25 cubic meters per hour. The cooling water pipe regulating valve is installed on the side of the operation cabinet for easy adjustment.

     

      8, air compressor and pipe mechanism:

    The production line is equipped with a 10-cube screw air compressor, a 10-cubic air dryer, and a 1.5-cubic gas storage tank for powder spraying equipment (with 3 filters), but the gas volume is surplus, so the pipe is put The system's cylinders were changed to cylinders, saving investment in hydraulic stations and hydraulic oil and the cost of changing hydraulic oil every year. Maintenance is also clean and convenient. A total of 8 forks and cylinders are required. (The gas pipeline and gas storage bag are the responsibility of the user)

     9. Pipeline platform

    The upper tube, the lower tube and the transition platform are all welded with 20# national standard I-beam, which ensures the robustness of the platform. The total length of the three platforms is 30 meters (the length is determined by the site and made by the user).

      10, manufacture and installation period

    The production period is 50 days from the effective date of the contract, and the installation period is 20 days (the installation conditions are available).


    Copyright© 2007-2013 songdao Electric furnace manufacturing Co,.Ltd All Rights Reserved
    Tel:18037961302 Sales hot line ( 24 hours service): 18037961302
    E-Mail:firstfurnace@gmail.com
    Adress: Luoxin Industrial Park, Luoyang, Henan